Outline Building Specification
Envelope
South
- Pre-patinated copper and weathered zinc
cladding panels, fully glazed curtain wall facade and silicon
sealed strip windows, with fully insulated single membrane roof
North
- Existing masonry walls retained with
new double-glazed windows and retail shopfronts, under new fully
insulated pitched slate roof
Entrance Doors
South
- Spectacular double height entrance lobby
in Caithness stone flooring, high quality exposed concrete and
armour coat plaster walls, with modern lighting and reception
desk
- Two Kone "Monospace" 13-person
electric traction passenger lifts serving upper floors
- High quality exposed concrete staircase to
upper floors
North
- Double height lobby with retained feature
cast iron columns, Caithness stone floor and armour coat plaster
walls
- One Kone "Monospace" 13-person electric
traction lift serving basement car park and upper floors
Lobbies
- Male and female toilets at all levels with
ceramic and stainless steel fitments, armour coat plaster walls,
"Dalsouple" rubber flooring
OFFICES - Developer's fitout
- WALLS - Plasterboard on insulated blockwork
or existing brickwork, plaster skimmed, emulsion painted
- FLOORS - Good quality carpet tiles over 200mm
deep raised access flooring on reinforced concrete floor slab
- CEILINGS - High quality exposed concrete
soffits
- HEATING/COOLING
SOUTH - Four pipe fan coil units within central services bulkhead
providing heating and cooling, utilising exposed concrete slabs
as heat sink
NORTH - Low pressure hot water radiator system providing heating
only
- VENTILATION - Natural ventilation throughout
via openable windows
- SMALL POWER -Twin sockets and data/coms outlets
via floor grommets at one per 6m2
Cable tray containment system beneath floor for distribution of
data cabling by Tenants
- LIGHTING - Recessed downlights and pendant
up/down luminaires to CAT2 requirements
RETAIL UNITS - Developer's
Shell
- RETAIL SHOP FRONTS - Designed by architect
in PPC aluminium and installed by the Landlord
- WALLS - Dense fair-faced blockwork walls
between units, painted finish; Insulated plasterboard to existing
brickwork walls
- CEILINGS - Exposed concrete soffit with high
quality finish (5th floor : plus perforated metal ceiling)
- FLOORS - Tamped concrete left unscreeded
for Tenant fitout
- SERVICES - Water, electricity, telecoms supplies
left capped off for Tenant connection
- DRAINAGE - 100mm "pop up" for Tenant
connection
- SIGNAGE - Tenant signage to be approved by
Landlord
|
| |
|